Modular Home Q&As
What does Affordable Modular Homes (AMH) do?
Affordable Modular Homes will discuss with you the ideal design for your section or development and will then order the frame and panelling from our ISO9000 Certified factory in China. During construction and prior to being loaded out for shipping the International company SGS will be inspecting all stages of construction to ensure that every part complies with NZ standards and will be properly finished.
Our units are designed and engineered in New Zealand so that we have complete confidence that all materials and assembly meet compliance. The homes are constructed to meet weather, wind and snow loadings in various parts of New Zealand
During the build process we secure a of Acceptance is issued by Waimakariri District Council. This is all that most Councils require for a Building Permit.
On arrival at our NZ depot, the structure is taken out of containers and checked by an MPI certified inspector and ourselves to ensure all components have arrived as specified and there is no damage..
In our Rangiora factory we assemble the frame and basic structure following which electrical and plumbing fittings are installed by LPB tradespeople. The fixtures and fittings are supplied by Millbrook Kitchens Ltd. Water heating is by Rinnai Gas Califont. All appliances and fittings have manufacture’s guarantees
What does the buyer do?
Applies for all permits. AMH will ensure buyers have full set of plans and engineering drawings to assist in this.
Arrange geotechnical site inspection if required
Foundations. Buyers must ensure the site is suitable for locating the building and can use a choice of foundations from screw piles (which we recommend) and a concrete slab.
Buyer arranges for electrical and plumbing work and connection to services.
What can the buyer change?
For starter homes we recommend that buyers accept the basic structure but there are opportunities to change the ‘look’ of the house by using different colours exterior colours from our range.
What is the quality of the flooring, grade of carpet? Wet areas and flooring of the Solo Range are high quality wood-grain vinyl. Carpeted areas are with durable carpet tiles but we can quote different grades, colours of carpet as required.
Are we able to select colour schemes both internal and external? To some extent. The houses do come pre-finished internally in neutral colours however all surfaces take paint and wallpaper if buyers desire after sale changes.
Joinery colours, is there a choice? Most of the joinery has durable white surfacing with stone bench tops. There is a modest choice of colours for the stone.
Can external walls be painted? Yes, if properly prepared. All external surfaces are pre-painted coloursteel but they can be re-coated with hi UV resistant paint.
Can I change the design and add extra rooms if I want? As needs change it is not that complex to add or remove an extra room as required. Each situation is unique and can be discussed with one of the team.
Can I fit my own bathroom out? You can certainly choose your own bathroom fittings and furnishing if you choose. Bathrooms are supplied and fitrted in New Zealand so there would be a PC sum towards your own choices.
Construction
Who will build the property? The modules comprising your property are fully assembled in our Rangiora factory. Multiple module units are assembled on site. We provide the expertise to do that however there is a cost for travel as necessary.
Do door sizes fit NZ door sizes 1980 High 610mm 660mm 710mm 760mm 810mm 860mm .Yes
If you’re in a wheelchair, can doorways be 780 clear and 750 right angle handrail into bathroom Yes
Can I get glass in NZ that will fix and come up to the same code for windows? Glass meets NZ Standards for safety and ordinary glazing. All glass areas are double glazed windows and thermally broken for comfort
What are the floors made of? The properties come complete with subframe that contains insulation and is part of the structure. The floor itself is fibre-cement that will take vinyl or carpet.
Energy efficiency of the window, what rating? The double-glazed windows are fully compliant, and the added feature of thermal breaks prevents heat leakage to the outside.
Are house components sustainably resourced and any possible health issues with giving off odours? House components are sustainable sourced and there are no health issues associated with fumes from manufactured materials.
Who connects property to main supply? Your own contractor
Is the structure designed to allow for a carport to be added later? Yes and/or garage. Designs can be independently sited or have internal access to the property. The house proper does not include a garage as the layout and location of a garage varies according to site.
Can I build a garage under the house out of block on a hill site Yes
Is a heat-pump the only heating option? Yes, although Solar Heating is also available as an option. The homes are well insulated with 100mm insulation in walls, floor and ceiling. With double glazing, heat loss is minimal and most buyers report very low levels of additional heat are required. A wall panel heater does seem to provide enough heat.
What is the cladding made of? Coloursteel
What sort of lighting, internal and external? Most lighting uses LED systems.
What are the finishing’s like tap ware etc made off/look? Sinks have chromed brass dual faucet; all other taps are brass with chrome
How will the externals age, permanent colours? All paintwork will age over time. We use very high UV resistant paints, but it would be a good estimate to have a minimum of 10 years use before repainting is required.
General and Financial
Payment. On confirmation of order we require a one-third deposit with a further progress payment of 30% during construction. Once the unit is complete and ex-factory the balance needs to be paid within two weeks. However during construction we can work with you to ensure your site is ready and the unit can be moved on to your site in a timely manner.
How long will delivery be after I order my home? From order to completion on site is approximately three to four months which allows time for consents and permits, foundation installation and site work. It should be noted that at present international shipping is no longer straightforward and Covid has introduced delays in some areas that may effect shipping timetable. For non-stock units we will advise when you are considering your order.
Will there be replacements available in NZ, IE door handles, taps etc? Yes – we carry and extensive range in our Depot however most of these items are sourced locally anyway.
If the iron breaks down within a year, who will fix it? All wall materials carry a 10 year guarantee and the structural steel 25 years. Should any issues arise and the company will arrange for remedial action.
Can I get a 10 year master builders cover on workman ship? Yes. The guarantee also extends to all materials but our structural warranty exceeds Master Builder’s coverage.
Does it cost me more to insure modular homes? No – but actual insurance costs depend on your choice of company